





Standardised documentation for substation engineers and installation contractors.
Hardware Datasheets
Installation Handbooks
Integration Drivers
Single-phase and three-phase meter terminal dimensions, casing schematics, and wiring layouts.
STS vending protocol configuration files and optical communication interface utilities.
Step-by-step mounting guides, tamper-detection sealing instructions, and optical port specs.
Verifying firmware revisions before deployment
Inspect LCD Diagnostic Screen
Match Optical Port Drivers
Verify BSTI Seal Status
Power the metering unit and check the scrolling parameter list for the exact installed firmware checksum.
Ensure your optical probe utility matches the baud rate specified in the matching hardware release note.
Confirm that physical tamper-evident calibration seals correspond to the accompanying laboratory certificate.
Need specialized connection schematics or firmware binaries?
Our engineering support desk assists regional utilities with custom tender documentation.


